Adaptation of Absheron EPS Platform
Performed Year: 2019Customer: JOCAP (SOCAR Absheron (50%) and TOTAL E&P Absheron B. V. (50%))
Adaptation of Absheron EPS platform (topside, jacket, link to existing system via bridge), 34 km of 12” fully rated (500 bar) insulated multiphase flow line, 34 Umbilical for controls, chemical and communication.
· Design of lightning protection
· Design HVAC systems
· Safety Declarations
· Construction Plan
· Project passports

Engineering Design of 3 CNG (Compressed Natural Gas) stations
Performed Year: 2019Customer: Azpetrol LTD LLC

WREP Casing Removal
Performed Year: 2019-2020Customer: Körpü Bina Tikinti MMC
The contract is about “New highway construction under “Azeravtoyol” State Agency in Ujar district crossing with BTC, SCPX, SCP and WREP export pipelines as a part of (R32) Ujar-Zardab-Aghjabadi highway reconstruction project” is awarded between 2019-2020 years for the below services which were implemented by “EXPERİMENT” Scientific Production Center
· Management of the Project.
· Preparing engineering drawings crossover section with the new road and BTC, SCP, SCPX, WREP pipeline.
· Preparing engineering drawings for casing removal at WREP
· Preparation of all necessary documents related to obtaining a work permit from BP (method of statement, etc.)
· Excavation, backfilling and fencing of the area, laying of concrete slabs are in full compliance with BP requirements

Executed Below Stated Works Related to Transportation and Installation of Jacket in Karabakh Oilfield
Performed Year: 2020Customer: Karabakh Operating Company in Azerbaijan Republic
- Executed below stated works related to transportation and installation of jacket in Karabakh oilfield located in Caspian Sea for the whole period of transportation and installation of jacket
- To obtain all licences, permits required by state authorities on behalf of Company and presents to company
- - Respond to all inquiries of state authorites directed by Company, carry out all related correspondence with state authorities, and keeps Company informed about the result of such correspondence

Preparation of the Project Regarding New Oil Wells
Performed Year: 2017-2020Customer: Binagadi Oil Operating Company
· Preparation of the project regarding new oil wells (85 new wells)
· Preparation environmental impact assessment
· Preparation environmental impact assessment

Design of Oil Pipeline – 2.6 km, D-530 mm
Performed Year: 2020Customer: Absheron Logistic Center

Audit Gas Supply System for Norm Cement
Performed Year: 2019-2020Customer: Norm ASC