Adaptation of Absheron EPS platform

    Performed Year: 2019
    Customer: JOCAP (SOCAR Absheron (50%) and TOTAL E&P Absheron B. V. (50%))
    arrow

    Adaptation of Absheron EPS platform (topside, jacket, link to existing system via bridge), 34 km of 12” fully rated (500 bar) insulated multiphase flow line, 34 Umbilical for controls, chemical and communication. 
    ·         Design of  lightning protection 
    ·         Design  HVAC systems 
    ·         Safety Declarations 
    ·         Construction Plan 
    ·         Project passports 

    project

    Engineering Design of 3 CNG (Compressed Natural Gas) stations

    Performed Year: 2019
    Customer: Azpetrol LTD LLC
    arrow
    project

    WREP Casing Removal

    Performed Year: 2019-2020
    Customer: Körpü Bina Tikinti MMC
    arrow

     
    The contract is about “New highway construction under “Azeravtoyol” State Agency in Ujar district crossing with BTC, SCPX, SCP and WREP export pipelines as a part of  (R32) Ujar-Zardab-Aghjabadi highway reconstruction project” is awarded between 2019-2020 years for the below  services which were implemented by “EXPERİMENT” Scientific Production Center 

    ·         Management of the Project.  
    ·         Preparing engineering drawings crossover section with the new road and BTC, SCP, SCPX, WREP pipeline. 
    ·            Preparing engineering drawings for casing removal at WREP 
    ·          Preparation of all necessary documents related to obtaining a work permit from BP (method of statement, etc.) 
    ·            Excavation, backfilling and fencing of the area,  laying of concrete slabs are in full compliance with BP requirements 

    project

    Executed below stated works related to transportation and installation of jacket in Karabakh oilfield

    Performed Year: 2020
    Customer: Karabakh Operating Company in Azerbaijan Republic
    arrow

    •  Executed below stated works related to transportation and installation of jacket in Karabakh oilfield located in Caspian Sea for the whole period of transportation and installation of jacket

    -  To obtain all licences, permits required by state authorities on behalf of Company and presents to company 
    • -  Respond to all inquiries of state authorites directed by Company, carry out all related correspondence with state authorities, and keeps Company informed about the result of such correspondence

    project

    Preparation of the project regarding new oil wells

    Performed Year: 2017-2019
    Customer: Binagadi Oil Operating Company
    arrow

     
    ·         Preparation of the project regarding  new oil wells (85 new wells) 

    ·         Preparation environmental impact assessment 

    project

    Design of Oil Pipeline – 2.6 km, D-530 mm

    Performed Year: 2020
    Customer: Absheron Logistic Center
    arrow
    project

    Obtaining relevant license from relevant department of Ministry of Agriculture of the Republic of Azerbaijan

    Performed Year: 2017
    Customer: Halliburton Eurasia Limited