Construction and Testing Jobs in Petrol Station

Performed Year: 2020
Customer: Azpetrol LTD MMC
arrow
project

Design of the Crossing Section Export Gas Pipelines with Highway

Performed Year: 2019
Customer: AKKORD STIK LLC/SOCAR
arrow

Design of the crossing section export gas pipelines  (gas export to Georgia)  with "Baku-Gazakh-Georgia” highway  

project

Construction of A 280mm High Pressure Water Pipeline

Performed Year: 2019
Customer: “Norm” LLC
arrow

 Design/Procurement/Construction of a 280mm high pressure water pipeline with Crossing 4 main export gas pipelines (gas export to Georgia) operated by SOCAR. 

project

Internal Gas and Water Supply System

Performed Year: 2019
Customer: Holcim OJSV (LafargeHolcim Switzerland and Holcim Auslandbeteiligungs GmbH)
arrow

 Designing/Procurement/Construction/Commissioning  of new Internal gas and water supply system within plant of Holcim OJSC 

project

Engineering Design of Intersections of the Main Gas Pipeline (D=300mm) Branch Gabala GDS (Gas Distribution Station)

Performed Year: 2019
Customer: Specialized railway station №11
arrow

 Engineering design of intersections of the main gas pipeline (D=300mm) branch Gabala GDS (Gas Distribution Station) which belongs to Agdash MGPD (Main Gas pipeline department), a sctructural unit of the Gas Export Department, with single line railway from Laki station to Gabala city.

Design Gas Supply System

Performed Year: 2018
Customer: Holcim OJSC
arrow

Design Gas supply system for Holcim OJSC cement plant.  
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency

project

Engineering Design of Intersections of the Main Gas Pipelines with The New Railway to be Built

Performed Year: 2018
Customer: INNOPRO LTD
arrow