Engineering design of relocation of gas pipelines
Performed Year: 2016

Engineering, supply and construction of metering station for gas which produced in Pirsaat field
Performed Year: 2015Engineering design of gas supply system for Production field which belongs Azertexnolayn MMC
Performed Year: 2015
Preparation of the project regarding new oil wells (15 wells)
Performed Year: 2016
Audit gas supply system for Norm Cement
Performed Year: 2019-2020
Engineering design of internal gas supply system of Baku Olimpic Stadium
Performed Year: 2015

Design 3 km pipeline from gas well to Central Gas processing facility
Performed Year: 2012