Supply of Floating Ball Valve , Pneumatic Spring Return Actuator, Eex ‘d’ Solenoid Valve and Eex ‘ia’ Limit Switches

Performed Year: 2018
Customer: Worley Europe Ltd
arrow

 Supply of  floating ball valve , Pneumatic Spring return actuator,Eex ‘d’ Solenoid valve and Eex ‘ia’ Limit switches. Also preparing  project documentation .

Tovuz Pipeline Project

Performed Year: 2017
Customer: North West Construction
arrow

 Tovuz Pipeline project. Hydrotest of water pipeline. Volume 57000m3. 

project

Obtaining Relevant License from Relevant Department of Ministry of Agriculture of the Republic of Azerbaijan

Performed Year: 2017
Customer: Halliburton Eurasia Limited
arrow

Engineering Design of Relocation of Gas Pipelines

Performed Year: 2016
Customer: Azeravtoyol State Agency
arrow

 Engineering design of relocation of gas pipelines within the protection zone of Baku-Shamakhi highway and crossings of gas pipelines by road 

project

Preparation of the Project Regarding New Oil Wells (15 Wells)

Performed Year: 2016
Customer: Shirvan Operating Company Limited, Azerbaijan Branch
arrow
project

Preparation of the Project Regarding New Oil Wells on Kurovdagh Field

Performed Year: 2016
Customer: “Shirvan Operating Company Limited” Azerbaijan branch
arrow
project

Design, Supplies, Construction, Commissioning of High Pressure Gas Pipeline for “Gilan Ceramic” Factory

Performed Year: 2016
Customer: Gilan Holding
arrow

 Design, supplies, construction, commissioning of high pressure gas pipeline for “Gilan Ceramic” factory. (Pipeline crossing WREP, BTC,SCP and SCPX pipeline / Operated by BP.) Design, and construction controlled and approved by BP. 

project