Supply of Floating Ball Valve , Pneumatic Spring Return Actuator, Eex ‘d’ Solenoid Valve and Eex ‘ia’ Limit Switches
Performed Year: 2018Customer: Worley Europe Ltd
Supply of floating ball valve , Pneumatic Spring return actuator,Eex ‘d’ Solenoid valve and Eex ‘ia’ Limit switches. Also preparing project documentation .
Tovuz Pipeline Project
Performed Year: 2017Customer: North West Construction
Tovuz Pipeline project. Hydrotest of water pipeline. Volume 57000m3.

Obtaining Relevant License from Relevant Department of Ministry of Agriculture of the Republic of Azerbaijan
Performed Year: 2017Customer: Halliburton Eurasia Limited
Engineering Design of Relocation of Gas Pipelines
Performed Year: 2016Customer: Azeravtoyol State Agency
Engineering design of relocation of gas pipelines within the protection zone of Baku-Shamakhi highway and crossings of gas pipelines by road

Preparation of the Project Regarding New Oil Wells (15 Wells)
Performed Year: 2016Customer: Shirvan Operating Company Limited, Azerbaijan Branch

Preparation of the Project Regarding New Oil Wells on Kurovdagh Field
Performed Year: 2016Customer: “Shirvan Operating Company Limited” Azerbaijan branch

Design, Supplies, Construction, Commissioning of High Pressure Gas Pipeline for “Gilan Ceramic” Factory
Performed Year: 2016Customer: Gilan Holding
Design, supplies, construction, commissioning of high pressure gas pipeline for “Gilan Ceramic” factory. (Pipeline crossing WREP, BTC,SCP and SCPX pipeline / Operated by BP.) Design, and construction controlled and approved by BP.
