Design Gas supply system
Performed Year: 2018
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency

Design of the crossing section export gas pipelines with highway
Performed Year: 2019

Construction of a 280mm high pressure water pipeline
Performed Year: 2019

Internal Gas and Water Supply System
Performed Year: 2019

Engineering Design of two oil tank (volume 2000m3 and 5000m3)”
Performed Year: 2001
Engineering Design of water tank
Performed Year: 2003

Guzdek Export Oil Terminal-Conseptual Research
Performed Year: 1999