Internal Gas and Water Supply System
Performed Year: 2018

Design, supplies, construction, commissioning of high pressure gas pipeline for “Gilan Ceramic” factory
Performed Year: 2016

Construction and Testing jobs in petrol station
Performed Year: 2020
Tovuz Pipeline project
Performed Year: 2017

Engineering, supply and construction of metering station for gas which produced in Pirsaat field
Performed Year: 2015NDT test, installation flow meters, preparing full documents for gas supply system
Performed Year: 2018
Preparing complete package of construction documents for gas supply system.
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency

Construction of a 280mm high pressure water pipeline
Performed Year: 2019