WREP Casing Removal

    Performed Year: 2019-2020
    Customer: Körpü Bina Tikinti MMC
    arrow

     
    ·         Design of crossing part with BTC, WREP, SCP, SCPX pipeline and Highway; 
    ·         Preparing Method Of Statements for excavation and removal WREP casing. 
    ·         Project management 
    ·         Procurment 
    ·         Excavation, backfilling and fencing of the area,  laying of concrete slabs are in full compliance with BP                  requirements 
    ·         All Design documents, procedures are approved, and controlled by BP 

    project

    Engineering design, construction, installation and testing of 6” high pressure gas pipeline (L=15.5km, P= 8,0 MPA)

    Performed Year: 2005-2006
    Customer: Gobustan Operating Company

    Supply of Arctic MX-4 Thermal paste

    Performed Year: 2019
    Customer: Worley Europe Ltd

    Supply of electric actuator

    Performed Year: 2019
    Customer: Providence Doytch AG Representative in the Republic of Azerbaijan

    Relocation of gas pipeline to the construction site of station B04

    Performed Year: 2018
    Customer: Baku Metropolitan CJSC
    arrow

    Relocation of gas pipeline to the construction site of station B04 to be built on the new III line of Baku metro in J.Mammadguluzadeh street, 2224 and 2459 block, Nasimi district, Baku city.