NDT Test, Installation Flow Meters, Preparing Full Documents for Gas Supply System

Performed Year: 2018
Customer: Holcim OJSV
arrow

Carry out NDT for Gas supply systems, installation flow meters and complete necessary repair  “Holcim” OJSV.
Preparing complete package of construction documents for gas supply system.
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency

project

Relocation of Gas Pipeline to the Construction Site of Station B04

Performed Year: 2018
Customer: Baku Metropolitan CJSC
arrow

Relocation of gas pipeline to the construction site of station B04 to be built on the new III line of Baku metro in J.Mammadguluzadeh street, 2224 and 2459 block, Nasimi district, Baku city.

Tovuz Pipeline Project

Performed Year: 2017
Customer: North West Construction
arrow

 Tovuz Pipeline project. Hydrotest of water pipeline. Volume 57000m3.

project

Engineering, Supply and Construction of Metering Station for Gas which Produced in Pirsaat Field

Performed Year: 2015
Customer: Petro-HongKong Pirsaat Oil Limited
arrow

Engineering Design, Construction, Installation and Testing of 6” High Pressure Gas Pipeline (L=15.5km, P= 8,0 MPA)

Performed Year: 2005-2006
Customer: Gobustan Operating Company
arrow