NDT Test, Installation Flow Meters, Preparing Full Documents for Gas Supply System
Performed Year: 2018Customer: Holcim OJSV
Carry out NDT for Gas supply systems, installation flow meters and complete necessary repair “Holcim” OJSV.
Preparing complete package of construction documents for gas supply system.
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency
Preparing complete package of construction documents for gas supply system.
Getting approval from Azerigas , relevant department of MES and Azerbaijan Energy Regulatory Agency

Relocation of Gas Pipeline to the Construction Site of Station B04
Performed Year: 2018Customer: Baku Metropolitan CJSC
Relocation of gas pipeline to the construction site of station B04 to be built on the new III line of Baku metro in J.Mammadguluzadeh street, 2224 and 2459 block, Nasimi district, Baku city.
Tovuz Pipeline Project
Performed Year: 2017Customer: North West Construction
Tovuz Pipeline project. Hydrotest of water pipeline. Volume 57000m3.

Engineering, Supply and Construction of Metering Station for Gas which Produced in Pirsaat Field
Performed Year: 2015Customer: Petro-HongKong Pirsaat Oil Limited
Engineering Design, Construction, Installation and Testing of 6” High Pressure Gas Pipeline (L=15.5km, P= 8,0 MPA)
Performed Year: 2005-2006Customer: Gobustan Operating Company