Engineering Design of Gas Pressure Regulation and Distribution Junction at Sangachal Head Facilities
Performed Year: 2006Customer: SOCAR

Engineering Design of 30” Gas Pipeline Between Sangachal Terminal and Sangachal Head Facilities
Performed Year: 2006Customer: SOCAR

Engineering Design, Construction, Installation and Testing of 6” High Pressure Gas Pipeline (L=15.5km, P= 8,0 MPA)
Performed Year: 2005-2006Customer: Gobustan Operating Company
Engineering Design of Water Tank
Performed Year: 2003Customer: Azerbaijan International Operating Company
Engineering Design of water tank (volume 800m3) and its foundation on the territory of “Sangachal Terminal”.

Engineering Design of Two Oil Tank (Volume 2000m3 and 5000m3)”
Performed Year: 2001Customer: Salyan Oil Operating Company

Guzdek Export Oil Terminal-Conseptual Research
Performed Year: 1999Customer: AZFEN