Engineering design and approval from relevant Government organization- cutting of the cover layer, metal ladder, preparation of reinforcement lines

Performed Year: 2021-2022
Customer: Facility Management Group LLC
arrow

Replacement of process water pipeline

Performed Year: 2022
Customer: Holcim Azerbaijan OSJC
arrow

Supply and installation of equipment and pipes of various diameters with a total length of about 500 meters were carried out.

Preparation of ecological reports

Performed Year: 2022
Customer: Halliburton Eurasia Limited
arrow

Preparation of ecological reports

Performed Year: 2022
Customer: PSL Energy Services Limited
arrow

Disposal of lithium batteries

Performed Year: 2022
Customer: Branch office of ‘Gyrodata Azerbaijan LLC' in Azerbaijan Republic
arrow

Construction of pipeline and electrical works in water treatment system

Performed Year: 2022
Customer: Holcim Azerbaijan OJSC
arrow

Concept engineering design of replacement of Norm AGDS (Automatic Gas Distrubution Station)

Performed Year: 2021
Customer: Norm Cement Plant
arrow