WREP Casing Removal

Performed Year: 2019-2020
Customer: Körpü Bina Tikinti MMC
arrow

 
The contract is about “New highway construction under “Azeravtoyol” State Agency in Ujar district crossing with BTC, SCPX, SCP and WREP export pipelines as a part of  (R32) Ujar-Zardab-Aghjabadi highway reconstruction project” is awarded between 2019-2020 years for the below  services which were implemented by “EXPERİMENT” Scientific Production Center 

·         Management of the Project.  
·         Preparing engineering drawings crossover section with the new road and BTC, SCP, SCPX, WREP pipeline. 
·            Preparing engineering drawings for casing removal at WREP 
·          Preparation of all necessary documents related to obtaining a work permit from BP (method of statement, etc.) 
·            Excavation, backfilling and fencing of the area,  laying of concrete slabs are in full compliance with BP requirements 

project

Preparation Ecological/Environmental Documents

Performed Year: 2016-2021
Customer: PSL Energy Services
arrow

 
·         Preparation Ecological/Environmental documents Ecological Audit 

·         Preparation reports 

project

Construction and Testing Jobs in Petrol Station

Performed Year: 2020
Customer: Azpetrol LTD MMC
arrow
project

Preparation of the Project Regarding New Oil Wells

Performed Year: 2017-2019
Customer: Binagadi Oil Operating Company
arrow

 
·         Preparation of the project regarding  new oil wells (85 new wells) 

·         Preparation environmental impact assessment 

project

Construction of A 280mm High Pressure Water Pipeline

Performed Year: 2019
Customer: “Norm” LLC
arrow

 Design/Procurement/Construction of a 280mm high pressure water pipeline with Crossing 4 main export gas pipelines (gas export to Georgia) operated by SOCAR. 

project

Design of the Crossing Section Export Gas Pipelines with Highway

Performed Year: 2019
Customer: AKKORD STIK LLC/SOCAR
arrow

Design of the crossing section export gas pipelines  (gas export to Georgia)  with "Baku-Gazakh-Georgia” highway  

project

Construction of A 280mm High Pressure Water Pipeline

Performed Year: 2019
Customer: “Norm” LLC
arrow

 Design/Procurement/Construction of a 280mm high pressure water pipeline with Crossing 4 main export gas pipelines (gas export to Georgia) operated by SOCAR. 

project