Designs of Internal gas supply system

    Performed Year: 2014
    Customer: "Norm" LLC
    arrow

     Designs of Internal gas supply system of  NORM cement plant. (The largest cement plant in the South Caucasus) 

    project

    Designing of 5000 m3 oil tank in Hovsan Oil field

    Performed Year: 2015
    Customer: Absheron Operating Company Limited
    arrow
    project

    Design of crossing Western Route Export Pipeline

    Performed Year: 2015
    Customer: Azəyolservis LLC
    arrow

     Design of crossing Western Route Export Pipeline with Baku- Gazakh-Georgia.  (project is controlled and approved by BP) 

    project

    Preparation of “Reconstruction Project of Oil Tank Park”

    Performed Year: 2015
    Customer: Absheron Operating Company Limited
    arrow
    project

    Engineering Design of crossing Western Route Export Pipeline with Hacıqabul-Kurdemir automobile road

    Performed Year: 2013
    Customer: PolatYol
    arrow

    Engineering Design of crossing Western Route Export Pipeline with Hacıqabul-Kurdemir automobile road (project is controlled and approved by BP). 

    project

    Preparation of the project regarding new oil wells on Kurovdagh field

    Performed Year: 2016
    Customer: “Shirvan Operating Company Limited” Azerbaijan branch
    arrow
    project

    Design, supplies, construction, commissioning of high pressure gas pipeline for “Gilan Ceramic” factory

    Performed Year: 2016
    Customer: Gilan Holding
    arrow

     Design, supplies, construction, commissioning of high pressure gas pipeline for “Gilan Ceramic” factory. (Pipeline crossing WREP, BTC,SCP and SCPX pipeline / Operated by BP.) Design, and construction controlled and approved by BP. 

    project